What you will learn

  • Record how many distinct parts you examined and what each one had to pass.
  • Even with zero findings, sample size changes the precision of the estimate.
  • Identify the rule the person responsible will use to decide what happens to the lot.

Who it is for: Anyone who inspects parts or receives a report that says only “0% rejected.”

Find out what was inspected

A shift handover says “0% rejected.” Did someone inspect every part in an order, draw a representative sample throughout the shift or look only at the first tray? The percentage could be identical in all three cases. Recover the part count, order, time window, inspection criterion and selection method before using the figure.

Suppose you check that a label is legible as a part leaves the line. A part with two unreadable characters counts as one nonconforming unit. If you rework the label and check it again, keep that second result in the part's history. Treating it as a new part would change the denominator.

Compare two samples that both came in at 0%

Consider two separate fictional inspections. In each, parts are randomly selected from a much larger production run. Assume independent outcomes, a stable probability of failure and the same reading criterion. In the Wilson calculator, enter the number inspected, enter zero nonconforming units and select the two-sided 95% confidence level.

For a count of zero, the upper end of the Wilson interval is z²/(n + z²), with z ≈ 1.96 at this level. For 20 parts, 3.84146/(20 + 3.84146) is approximately 0.1611. Multiply by 100 to express it as a percentage.

Compare two samples that both came in at 0%
Distinct partsNonconformingObserved percentageTwo-sided 95% Wilson interval
2000%0% to 16.11%
20000%0% to 1.88%

What the limits mean on the shop floor

The team wants to know whether a 5% rate is compatible with its findings. Five percent falls inside the first interval and outside the second. If the true rate were 5%, the chance of seeing twenty conforming parts in a row would be 0.95 raised to the twentieth power, or about 35.85%. A sample this size can easily contain zero failures even when failures occur.

The 95% describes the approximate coverage of the method over repeated samples under the same model. The upper endpoint reflects uncertainty about the rate. For a shipping decision, look up the acceptance plan that applies to the order.

When the interpretation changes

If every part came consecutively from one cavity and failures occur in clusters, say which part of production is represented. A narrow interval cannot account for a missing cavity. Keep sources identifiable and revisit how the next sample will be drawn.

If the lot contains 20 parts and you inspected all 20, you can report their complete observed result for that criterion. Confidence in the inspection also depends on whether the method can detect the issue. For a sample drawn without replacement from a substantial share of a finite lot, check which calculation the lot's sampling plan specifies.

A handover entry you can adapt

“Order L-17, 08:00 to 12:00. We selected 20 distinct parts at random from production during that window. All 20 labels met the legibility criterion in instruction I-04, revision B. Observed result: 0/20. Under the stated conditions, the two-sided 95% Wilson interval for the process rate is 0% to 16.11%. The quality lead will review lot disposition under the acceptance plan.” Replace the references and sampling method with the ones you actually used.

Mistakes to avoid

  • Confusing a defect count with a count of affected parts.
  • Counting a reinspection of the same item as a new unit.
  • Reporting an endpoint of a two-sided interval as a 95% one-sided bound.

Checklist before continuing

  • The report identifies the population, time window and sampling method.
  • The original counts appear beside the percentage.
  • The interval specifies the method, confidence level and that it is two-sided.
  • The record identifies the applicable acceptance plan and the person responsible for disposition.

Sources and review