VYRCO

VYRCO / Explore everything

All of VYRCO, organized by task

53 interactive tools, 24 PDF/HTML documents, 12 Word/Excel templates and 6 articles. Search in Spanish or English and distinguish what you can calculate, read or download.

Filters

Levels guide reading; they do not authorize work or certify competence.

95 items

ToolWork and life

Work handover and continuity

Spanish-language local tool for responsibilities, next steps, access checks and receiver review.

Spanish-language tool · No accountOpen →
ExcelWork and life

Task and project tracking

Spanish task tracker with owners, priorities, due dates, progress and workload summaries.

Excel · Spanish-language file · v1.1Open →
ToolMachining

Workshop unit converter

Convert length, pressure, torque, mass, flow and temperature with explicit units and compatibility checks.

CalculatorOpen →
ToolMachining

Milling feed rate

Calculate feed per minute and per revolution from RPM, effective teeth and feed per tooth.

CalculatorOpen →
ToolMachining

Taper geometry

Calculate half angle, included angle and diametral taper ratio for a conical section.

CalculatorOpen →
ToolQuality and measurement

Tolerance stack

Add and subtract dimensions to find an assembly nominal and its worst-case bounds.

CalculatorOpen →
ToolQuality and measurement

Sample statistics

Summarize measurements with mean, median, sample deviation, range and extremes.

AnalysisOpen →
ToolQuality and measurement

Cp and Cpk indices

Calculate capability indices from limits, a mean and an estimate of sigma.

AnalysisOpen →
ToolMaintenance

Downtime Pareto

Rank causes by lost minutes and see each cause’s share of total downtime.

AnalysisOpen →
ToolDocumentation

Five whys builder

Organize hypotheses, evidence and a verifiable action without inventing causes.

BuilderOpen →
ToolDocumentation

8D working report

Bring the problem, actions and evidence into eight sections with visible gaps.

BuilderOpen →
ToolDocumentation

Shift handover

Prepare a clear handover with status, work completed, issues and follow-up owners.

BuilderOpen →
ToolDocumentation

Control plan builder

Connect defined characteristics, methods and reactions while keeping missing information visible.

BuilderOpen →
DocumentDocumentationIntermediate

Engineering change record

Keep the reason, approval, implemented configuration and verification evidence connected.

PDF + HTML · v1.0Open →
DocumentQuality and measurementIntermediate

Capability data collection plan

Define where data will come from and what conclusions they may support before calculating indices.

PDF + HTML · v1.0Open →
DocumentQuality and measurementIntermediate

Before measuring: hold-point card

Detect missing information, mismatches or unresolved conditions before dimensional measurement begins.

PDF + HTML · v1.0Open →
DocumentQuality and measurementIntermediate

Replacement component: verify before installation

Compare the documented requirement, removed component, and replacement candidate before modification or installation. Helps stop variant mix-ups; it does not certify interchangeability or release the mold.

PDF + HTML · v1.0Open →
DocumentMolding and materialsIntermediate

Samples by cavity and shot

Link every sample to its cavity, shot and documented condition. A practical extension of resource 06: it does not replace the defect record or the statistical plan in resource 12.

PDF + HTML · v1.0Open →
DocumentMaintenanceIntermediate

Mold vents: observe before intervening

Create one record per vent location without confusing a visual observation with a measurement, root cause or repair authorization. Complements general inspection (01), defect documentation (06) and post-maintenance verification (14).

PDF + HTML · v1.0Open →
DocumentQuality and measurementIntermediate

Two different measurements: document before deciding

Preserve two readings and their context so the responsible person can decide what to check. Complements dimensional record 05 and instrument pre-use check 07; does not replace them.

PDF + HTML · v1.0Open →
DocumentMaintenanceIntermediate

Cooling circuits: record before and after

Preserve circuit identity, test configuration, and readings before and after an authorized activity. Supports technical review; by itself, it does not declare that a circuit is clean, leak-free, or fit for production.

PDF + HTML · v1.0Open →
DocumentMolding and materialsIntermediate

Drying: from readings to evidence

Organize requirements, drying-system readings, and material results into a reviewable record. Identify evidence gaps without treating a setpoint or dryer indicator as lot acceptance.

PDF + HTML · v1.0Open →
WORD + EXCEL · FREE

Documents for work and everyday life

6 Word and 6 Excel files in Spanish: résumé, letters, meetings, projects, budget, expenses, inventory, maintenance and habits. Detailed guides and examples included.

Explore Word and Excel →