VYRCO

VYRCO / Documents

24 documents to record your work

Original forms with instructions, a fictional example and sources. Every document offers a PDF and an HTML guide or form; editable options are identified on its page.

DocumentDocumentationIntermediate

Engineering change record

Keep the reason, approval, implemented configuration and verification evidence connected.

PDF + HTML · v1.0Open →
DocumentQuality and measurementIntermediate

Capability data collection plan

Define where data will come from and what conclusions they may support before calculating indices.

PDF + HTML · v1.0Open →
DocumentQuality and measurementIntermediate

Before measuring: hold-point card

Detect missing information, mismatches or unresolved conditions before dimensional measurement begins.

PDF + HTML · v1.0Open →
DocumentQuality and measurementIntermediate

Replacement component: verify before installation

Compare the documented requirement, removed component, and replacement candidate before modification or installation. Helps stop variant mix-ups; it does not certify interchangeability or release the mold.

PDF + HTML · v1.0Open →
DocumentMolding and materialsIntermediate

Samples by cavity and shot

Link every sample to its cavity, shot and documented condition. A practical extension of resource 06: it does not replace the defect record or the statistical plan in resource 12.

PDF + HTML · v1.0Open →
DocumentMaintenanceIntermediate

Mold vents: observe before intervening

Create one record per vent location without confusing a visual observation with a measurement, root cause or repair authorization. Complements general inspection (01), defect documentation (06) and post-maintenance verification (14).

PDF + HTML · v1.0Open →
DocumentQuality and measurementIntermediate

Two different measurements: document before deciding

Preserve two readings and their context so the responsible person can decide what to check. Complements dimensional record 05 and instrument pre-use check 07; does not replace them.

PDF + HTML · v1.0Open →
DocumentMaintenanceIntermediate

Cooling circuits: record before and after

Preserve circuit identity, test configuration, and readings before and after an authorized activity. Supports technical review; by itself, it does not declare that a circuit is clean, leak-free, or fit for production.

PDF + HTML · v1.0Open →
DocumentMolding and materialsIntermediate

Drying: from readings to evidence

Organize requirements, drying-system readings, and material results into a reviewable record. Identify evidence gaps without treating a setpoint or dryer indicator as lot acceptance.

PDF + HTML · v1.0Open →

Which format should you choose?

Use the PDF to print and write by hand. HTML may be an editable form or a reference guide. Each resource page identifies the available options, including TXT where provided, and explains how to save your copy. File formats are not counted as separate resources.

WORD + EXCEL · FREE

Documents for work and everyday life

6 Word and 6 Excel files in Spanish: résumé, letters, meetings, projects, budget, expenses, inventory, maintenance and habits. Detailed guides and examples included.

Explore Word and Excel →

Technical paths for evidence-based work