Engineering change record

Keep the reason, approval, implemented configuration and verification evidence connected.

Who it is for and what is included

Engineering, mold shop, quality and document-control personnel.

Level: Intermediate. Includes instructions, recording fields, a fictional example and reference sources.

How to use it

  1. Identify request, requester and current configuration. Describe the problem separately from the proposed change; attach references.
  2. List affected components, documents, batches, spare parts and teams. Record impacts awaiting review, including interfaces, inspection and training.
  3. Document the decision, authority and conditions before implementation. A registered request is not an approval.
  4. Record what was implemented, by whom, when and at which revision or batch it becomes effective. Preserve links to previous versions and withdrawn documents.
  5. Verify against previously agreed criteria. Record results, evidence, open items and follow-up before closing the change.

Fictional example

FICTIONAL: EC-DEMO-11 requests connection identification changes from revision B to C. Drawing, inventory and workstation copy need updating. The proposal is approved, but verification of installed labels is pending; the change stays open.

Scope and limitations

Does not authorize modifications by itself or replace design validation, risk assessment, customer requirements or applicable contractual approval.

Sources consulted

Editorial review: 2026-10-10 · Original forms and general guidance. Always apply the drawing, manual and authorized procedure for your case.

NEXT STEP

Keep building your records

Learn and apply this document

ToolDocumentation

Control plan builder

Connect defined characteristics, methods and reactions while keeping missing information visible.

BuilderOpen →
ToolDocumentation

8D working report

Bring the problem, actions and evidence into eight sections with visible gaps.

BuilderOpen →