What you will learn
- Original timestamps let you reconstruct how long a line actually stopped.
- You can keep concurrent observations in their own category until their attribution is resolved.
- Ranking by minutes answers a different question from ranking by the number of incidents.
Who it is for: Anyone reconciling production logs, preparing a shift handover or choosing a stoppage to investigate.
Decide which clock you are measuring
A line supervisor wants to know how many scheduled production minutes the line lost between 08:00 and 12:00. In this fictional case, the line-state recorder confirms three separate stops. The operator's log and the alarm history describe conditions present during those stops.
Use the same line, reporting window and time reference for all records. Preserve each start time, end time and source. If an intervention began on the previous shift, keep its full original interval and assign only the portion inside the reporting window to this analysis. Keep equipment time, line time and labor time separate if you also need those measures.
| Time | Recorded observation | Source |
|---|---|---|
| 08:05–08:25 | Alarm active | Alarm log A7 |
| 08:15–08:35 | Material unavailable | Entry M3 |
| 10:00–10:10 | Material unavailable | Entry M8 |
| 11:00–11:10 | Waiting for labels | Entry E4 |
Mark each change of state
The first stop began at 08:05 and ended at 08:35. Each source contributes 20 incident minutes. From 08:15 to 08:25 they describe the same line during the same ten minutes. This stop lasted 30 minutes. Keep both observations attached to the shared segment.
For this exercise, the ten minutes go under “concurrent incidents” because the record cannot assign them to a single category. If your plant has an allocation rule, apply it and record the reference. A colleague can then reconstruct your figures from the original times.
| Stopped interval | Category for the Pareto | Minutes |
|---|---|---|
| 08:05–08:15 | Alarm | 10 |
| 08:15–08:25 | Concurrent incidents | 10 |
| 08:25–08:35 | Material unavailable | 10 |
| 10:00–10:10 | Material unavailable | 10 |
| 11:00–11:10 | Waiting for labels | 10 |
See how the two records overlap

Check the total before reading the bars
The line recorder totals 30 + 10 + 10 = 50 minutes. Adding the four raw incident records gives 20 + 20 + 10 + 10 = 60 minutes. The overlapping segment accounts for the ten-minute difference. If a difference remains, check clock alignment, open-ended stops and restart times that another record might confirm.
Enter the five segments from the table into the Downtime Pareto tool. Material unavailable accounts for 20 minutes across two segments, or 40% of the 50 stopped minutes. Alarm, concurrent incidents and waiting for labels each contribute ten minutes, or 20% apiece. They are tied. The denominator for the 40% figure is the stopped time on this line.
Choose a question the next shift can answer
Find the two material entries and ask when each replenishment was requested and delivered. The overlap needs a separate check. Knowing when the alarm cleared and when material became available would help establish what prevented restart in each segment.
If the next shift uses “no material” and “material unavailable” for the same condition, agree on one category and retain the original wording alongside it. To count incidents, use the original event IDs. The five segments in the table came from four records and three line stops.
An entry for the next shift
“Line L2, 08:00–12:00. The line recorder shows three stops totaling 50 min. Material unavailability alone accounted for two segments totaling 20 min. Another 10 min coincided with an active alarm and are pending attribution. On the next shift, production will compare request and delivery times for replenishment entries M3 and M8.” Times and identifiers in this example are fictional.
Mistakes to avoid
- Using alarm duration as proof that the entire line stopped for that long.
- Adding minutes from two machines and reporting them as elapsed line time.
- Assigning all overlapping minutes to one cause without recording the evidence or rule used.
Checklist before continuing
- Every segment has start and end times and belongs to an identified line.
- All stopped minutes are counted once across the categories.
- The source records for concurrent events can be found.
- The handover includes a specific question and a person responsible for following up.
Sources and review
- ASQ · Pareto chart
Choosing a measure and period, grouping categories and calculating shares. The times and allocation in this example are part of VYRCO's fictional case.
Accessed: 2026-11-20 - ASQ · Check sheet
Defining what is observed and setting up a repeatable production record.
Accessed: 2026-11-20
Original general guidance by VYRCO based on the listed references. Examples are fictional. Editorial review does not validate your process. To correct an item, identify the article, date and source at info@vyrco.com.